EV charging

Let your utility help pay for the chargers.

Level 2 and DC fast charging for multifamily and commercial properties — built using utility make-ready and rebate programs that can offset project costs, depending on program, site, and segment.

How it's funded

Utility programs can offset the cost of installing charging.

These programs run through your electric utility. They exist because the grid needs chargers built, and they're designed to reduce what the property owner pays. Coverage varies by utility, program, and site.

Covered by the program

Make-ready infrastructure

Utility make-ready programs can fund eligible electrical infrastructure leading to the charger, such as service feeds, transformers, meters, and conduit. Which items are covered, and how much, depends on the program, customer segment, and location, and the property owner typically remains responsible for costs a program doesn't cover.

Covered by the program

Equipment rebates

Per-port rebates on approved networked chargers — Level 2 and DC fast alike — reduce the hardware cost. DC fast equipment sits in its own rebate tier, typically higher per port to reflect the larger installation.

Yours to keep

Ongoing revenue

Once energized, chargers bill drivers for use through the network's payment system, and some programs offer additional payments for managed-charging participation. Revenue depends on utilization and how you price charging, and isn't guaranteed.

Level 2 or DC fast

Two different chargers, for two different visits.

We install both. The right one depends on how long a vehicle sits at your property — not on which is "better."

How long does a vehicle stay at your property?
Drag the marker. The right charger changes with the stay.
DC fast fits
Level 2 fits
Best fit

Level 2

40–80 miles
of range added in 4 hours, at a typical 10–20 miles per hour
Less suited

DC fast

More speed than needed
A real charge takes 20–40 minutes; the vehicle would sit for hours afterward.

Level 2 territory: workplaces, multifamily parking, and hotels.

Fast charging draws a lot of power in short bursts, which can raise your demand charges. See how storage fits

Illustrative guide using typical figures. Actual charging time depends on the vehicle, its battery, and the charger's power. We confirm the right fit in a site review.

Level 2

For long stays

Multifamily parking, workplace lots, hotels — anywhere a vehicle sits for hours rather than minutes.

  • 10–20 miles of range added per hour
  • 240-volt AC connection
  • Lower installed cost per port
  • The workhorse of the utility programs
Level 3 — DC fast

For quick turnover

Retail, hospitality, and fleet or highway-adjacent sites where vehicles come and go.

  • A real charge in 20–40 minutes instead of hours
  • Direct current at far higher power
  • Higher installed cost, higher rebate tier
  • Strongest where traffic turns over fast

The tradeoff worth knowing: DC fast gets its speed by pulling a large amount of power in a short burst — the same pattern that drives up a property's demand charges. If DC fast charging is on the table, it's worth having the battery storage conversation at the same time, not after the fact.

How it works

Four steps from site walk to energized.

1

Site review

A short call and a site walk. We check parking layout, existing electrical capacity, and which incentive tier the property falls into. No charge for the review, no commitment.

2

Utility filing

We prepare and submit the full make-ready and rebate application with your utility, and manage the approval process end to end.

3

Installation

Licensed electrical contractors handle the charger installation, with permitting and inspection as required, scheduled around your tenants and operations.

4

Activation

Chargers go live on the network, driver billing turns on, and the property is EV-ready — an amenity you can put on the listing.

Eligibility

Dedicated parking is the starting point.

Your property may be a fit if
✓It has dedicated, owner-controlled parking in a utility territory with an active incentive program
✓It's a multifamily building, office, retail, hotel, or other commercial site
✓The electrical service has — or can reasonably add — capacity for charging equipment
✓For DC fast specifically: higher available power and a high-turnover use case
✓You own the property or can bring the decision to the owner

There's no charge for the assessment, and the only cost of asking is five minutes. Final eligibility and incentive amounts are determined by your utility and program administrators.

Start here

Send us your property address. We'll tell you what it qualifies for.

  • ✓We confirm your utility territory and incentive tier
  • ✓You get a plain answer on what the property qualifies for
  • ✓No charge for the review, nothing to sign — and if it isn't a fit, we say so

Prefer email? info@concordenergyusa.com